Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
稲垣 大介*; 津坂 仁和*; 青柳 和平; 名合 牧人*; 井尻 裕二*; 重廣 道子*
Proceedings of ITA-AITES World Tunnel Congress 2015 (WTC 2015)/41st General Assembly, 10 Pages, 2015/05
In the Horonobe Underground Research Laboratory located in Hokkaido, Japan, "3D geological structure/construction data visualization system" has been employed to facilitate observational construction. Using this system, geological data, measurement data, construction data and prediction analysis results are visualized and integrated comprehensively as the construction proceeds. The planned support pattern was, for instance, examined according to the visualized data. Integrating the data of seismic reflection survey and the grouting results into the system, the estimated distribution of faults were revised and the potential area of support instability was determined; this approach has been proven to be effective, completing the shaft construction without any troubles. In addition, the 3D visualization system allows to share clear and common understanding about geological condition and deformation behavior of rock mass among the construction team members. Thus, the system will contribute to more successful implementation of observational construction in understanding rock mass behavior and ensuring optimal structural support and construction safety.
山崎 雅直*; 津坂 仁和*; 大谷 達彦*; 進士 正人*
土木学会論文集,F2(地下空間研究)(インターネット), 71(1), p.1 - 10, 2015/04
本研究は、立坑掘削に伴う坑壁地質観察により得られた割れ目の長さの総和を壁面面積で除した割れ目頻度と、割れ目情報(長さ、方向、開口幅)からステレオロジーの概念を適用して推定した透水係数とは、現地の透水試験結果と高い相関性が得られたことから、坑壁地質観察から地盤の透水係数を簡便に予測する手法を提案する。適用にあたっては高品質の坑壁地質観察記録が重要であり、北海道幌延町において日本原子力研究開発機構が建設中の地下研究施設の立坑掘削時の記録を用い、クラックに関する情報を基に、立坑の3次元クラックテンソルと透水テンソルを推定し、近傍の深層ボーリング孔を用いた透水試験結果と比較した。